| The Cambridge as modeled before construction. |
 |
 |
| After much searching the lot is chosen. |
The view from the cliff behind the lot
as amazing. |
 |
 |
| The house fits by 1" and the digging
begins. |
Footings and forms are in waiting for
concrete. |
 |
 |
| The forms are stripped and the floor
joists go in. |
The floor joists are recessed into the
concrete to eliminate a step. |
 |
 |
| The first wall goes up after the plywood
subfloor is put down. |
The house is taking shape as the rest
of the walls are erected. |
 |
 |
| Just one BIG wall left to go on the
main floor. |
All the walls are now up. |
 |
 |
| The roof starts going on. |
The attic trusses need to be spread
out. |
 |
 |
| Looking from the 2'nd floor to the Great
Room wall. |
Looking up from the Great Room. I hope
it doesn't rain. |
 |
 |
| Looking towards the kitchen from the
Living Room. |
Looking down from the loft. |
 |
 |
| This will be the Bonus Room over the
garage. |
Looking out from the 2'nd floor bedroom. |